Dafora announces starting the drilling activity at 382 Totea well. The project is based on the contract signed with OMV Petrom. The projected depth is 3160 meters and the operation will be carried out with our MR 8000 drilling rig.
31
Jul
Dafora announces starting the drilling activity at 382 Totea well. The project is based on the contract signed with OMV Petrom. The projected depth is 3160 meters and the operation will be carried out with our MR 8000 drilling rig.